T-24807
PaidInvoice INV-10388Prevailing wageTime card reviewedGranite Ridge Builders · Granite Ridge — Midtown Tower · Level 17 deck pour
Job date
2026-09-08
Unit / operator
Pump 42 · Luis Ortega
Location
Sacramento Yard · CA
Rate sheet
Customer job #
GRB-4402
Terms
Net 30
Ticket total
$2,407.78
4.50 h · 92 yd · 1.50 h travel · $85.00 extras · $0.00 disc · $183.50 tax
Open in DispatchRecord paymentV2
Prevailing wage job. On-job hours are reportable. The certified-payroll queue arrives with Certified Payroll (V2).
Ready to invoice?
- Operator time card reviewed. Reviewed in Time Cards & Payroll.
- Times captured. Left yard through returned to yard.
- Actual yards entered. Drives the per-yard charge.
- Rates applied. From 2026 Sacramento Standard.
- No pump-size fallback. Size sent is priced on the sheet.
- Overrides reviewed. No overrides.
- Billed hours match the time card. Within a quarter hour.
- Operator extras accepted. Nothing pending.
Charge summary
Pump time — 4.50 h$1,057.50
Yardage — 92 yd$782.00
Travel — 1.50 h$217.50
Extras & add-ons$85.00
Fuel surcharge$82.28
Surcharges$0.00
Discounts$0.00
Sales tax — 8.25%$183.50
Total$2,407.78