T-24809
PricedTime card reviewedIronwood Concrete Co. · Ironwood — Elk Grove Logistics · Tilt panel pour
Job date
2026-09-15
Unit / operator
Pump 47 · Marcus Bell
Location
Sacramento Yard · CA
Rate sheet
Customer job #
IRN-2208
Terms
Net 30
Ticket total
$2,925.95
5.00 h · 148 yd · 1.50 h travel · $85.00 extras · $-150.00 disc · $234.43 tax
Open in DispatchRecord paymentV2
Ready to invoice?
- Operator time card reviewed. Reviewed in Time Cards & Payroll.
- Times captured. Left yard through returned to yard.
- Actual yards entered. Drives the per-yard charge.
- Rates applied. From 2026 Sacramento Standard.
- No pump-size fallback. Size sent is priced on the sheet.
- Overrides reviewed. No overrides.
- Billed hours match the time card. Within a quarter hour.
- Operator extras accepted. Nothing pending.
Charge summary
Pump time — 5.00 h$1,175.00
Yardage — 148 yd$1,258.00
Travel — 1.50 h$217.50
Extras & add-ons$85.00
Fuel surcharge$106.02
Surcharges$0.00
Discounts$-150.00
Sales tax — 8.25%$234.43
Total$2,925.95