T-24810
ProcessedInvoice INV-10416Time card reviewedDelta Structures · Delta — Stockton Waterfront · Shear walls
Job date
2026-09-15
Unit / operator
Pump 52 · Hector Diaz
Location
Stockton Yard · CA
Rate sheet
Customer job #
DS-3395
Terms
Net 30
Ticket total
$2,216.66
3.50 h · 88 yd · 1.50 h travel · $66.00 extras · $0.00 disc · $168.94 tax
Open in DispatchRecord paymentV2
Ready to invoice?
- Operator time card reviewed. Reviewed in Time Cards & Payroll.
- Times captured. Left yard through returned to yard.
- Actual yards entered. Drives the per-yard charge.
- Rates applied. From 2026 Stockton Standard.
- No pump-size fallback. Size sent is priced on the sheet.
- Overrides reviewed. No overrides.
- Billed hours match the time card. Within a quarter hour.
- Operator extras accepted. Nothing pending.
Charge summary
Pump time — 4.00 h (minimum applied)$940.00
Yardage — 88 yd$748.00
Travel — 1.50 h$217.50
Extras & add-ons$66.00
Fuel surcharge$76.22
Surcharges$0.00
Discounts$0.00
Sales tax — 8.25%$168.94
Total$2,216.66