T-24811
UnpricedZeroed outTime card reviewedAssociated Concrete Pumping · Internal — Shop · Plant test pour
Job date
2026-09-17
Unit / operator
Pump 28 · Trent Vance
Location
Sacramento Yard · CA
Rate sheet
Customer job #
—
Terms
Net 30
Ticket total
$0.00
1.75 h · 12 yd · 0.75 h travel · $0.00 extras · $0.00 disc · $0.00 tax
Open in DispatchRecord paymentV2
Zeroed out. Shop time — pump ran a plant test, no customer charge.
Ready to invoice?
- Operator time card reviewed. Reviewed in Time Cards & Payroll.
- Times captured. Left yard through returned to yard.
- Actual yards entered. Drives the per-yard charge.
- Rates applied. From 2026 Sacramento Standard.
- No pump-size fallback. Size sent is priced on the sheet.
- Overrides reviewed. No overrides.
- Billed hours match the time card. Within a quarter hour.
- Operator extras accepted. Nothing pending.
Charge summary
Pump time — 4.00 h (minimum applied)$940.00
Yardage — 12 yd$102.00
Travel — 0.75 h$108.75
Extras & add-ons$0.00
Fuel surcharge$46.03
Surcharges$0.00
Discounts$0.00
Sales tax — 8.25%$0.00
Total$0.00