T-24814
PricedPrevailing wageTime card reviewedGranite Ridge Builders · Granite Ridge — Midtown Tower · Level 19 deck pour
Job date
2026-09-17
Unit / operator
Pump 42 · Luis Ortega
Location
Sacramento Yard · CA
Rate sheet
Customer job #
GRB-4417
Terms
Net 30
Ticket total
$2,634.63
3.75 h · 65 yd · 1.50 h travel · $702.50 extras · $0.00 disc · $153.73 tax
Open in DispatchRecord paymentV2
Override on this ticket. A rate or quantity was overridden — recorded with user and reason in Notes & Activity.
Prevailing wage job. On-job hours are reportable. The certified-payroll queue arrives with Certified Payroll (V2).
Ready to invoice?
- Operator time card reviewed. Reviewed in Time Cards & Payroll.
- Times captured. Left yard through returned to yard.
- Actual yards entered. Drives the per-yard charge.
- Rates applied. From 2026 Sacramento Standard.
- No pump-size fallback. Size sent is priced on the sheet.
- Overrides reviewed. Manual rate or quantity overrides are on this ticket.
- Billed hours match the time card. Within a quarter hour.
- Operator extras accepted. Nothing pending.
Charge summary
Pump time — 4.00 h (minimum applied)$940.00
Yardage — 65 yd$552.50
Travel — 1.50 h$217.50
Extras & add-ons$702.50
Fuel surcharge$68.40
Surcharges$0.00
Discounts$0.00
Sales tax — 8.25%$153.73
Total$2,634.63